
Our Solutions
Real Impact in Large-Scale Projects
Discover our digital solutions: transformation cases delivered to major energy and mining groups, and our own products for engineering and construction.
WHY AUTIS
Engineering data is complex. We simplify it.
We combine BI, BIM 4D, and AI Agents in a cohesive stack for large-scale infrastructure projects.
- 01
The problem
Fragmented data
How we solve it · See
Real-time executive dashboards connected to Primavera P6, SAP, and Microsoft 365. Managers spot deviations before opening a spreadsheet.
- 02
The problem
Manual reports
How we solve it · Automate
AI Agents that audit XER schedules, generate PDF reports, and eliminate hours of weekly manual work — without leaving Microsoft Teams.
- 03
The problem
Delayed decisions
How we solve it · Execute
BIM 4D connected to the schedule. Every model element linked to an activity. Real progress visible by phase, discipline, and work front.
Platform
The new way to manage projects with AI and BIM.
We connect BIM, schedule, and real progress in a web platform accessible from any device.
The Autis 4D platform runs in the browser — no installation, no heavy license. Natively integrates with Navisworks, Primavera P6, MS Project, and Microsoft 365.

REAL-TIME VISIBILITY
From the 3D model to the executive KPI on one screen.
Physical progress by discipline, S-curve, constraints, and 4D progress — all powered by your project's real data.

AUTIS 4D · SAMPLE MODEL
Explore the Autis 3D model.
Rotate the 3D model, browse its tree, and use the visualization tools in this public sample report.
Static previewSample model published by Autis. Interactive exploration is provided by Microsoft Power BI.
In the Autis approach, visual exploration informs the decision:
Discipline.Place the work in its technical context.
Package.Connect executable scope to the plan.
Constraint.Identify what is blocking progress.
Next action.Define who should act and what to do.
This flow explains the Autis Project Controls method; these are not filters or fields in this report.
Transformation Cases
Real results in large-scale projects.
Click each case to see the challenge, solution, and results.
Digital Transformation at a 500MW Thermoelectric Complex
Client: European Multinational in the Energy Sector
The complex operated with completely fragmented data: 15+ international contractors used their own ERPs, schedules — ranging from Primavera P6 to Excel spreadsheets — and proprietary report formats. The Project Controls team manually processed hundreds of spreadsheets every week, resulting in reports delayed 3 to 5 days and a high risk of cross-source inconsistencies. Critical contractual milestones for energy delivery to the interconnected grid were at risk, and management had no reliable visibility into the real state of the project. Regulatory pressure demanded complete traceability of all cost and schedule events.
PLATFORM ARCHITECTURE
How Autis connects everything.
From XER file and BIM model to executive dashboard and automated report.
Schedule a 30-minute conversation.
We map where your operation has the highest leverage to gain with BI, BIM, or AI Agents.
Talk to Autis